Greensolv

Savings calculator

1. Industry

2. Stripping volume (daily)

3. Yearly savings*

  • Other chemicals

    $14 167

  • Sandblasting

    $83 750

  • Singeing / Torching

    $8 467

* based on 250 working days per year. Numbers include labor at $20/hour, capital investment, chemicals, gas, sand and/ or electricity consumption.

See details

4. Ask for a quote

Send
November 4, — Advices

CONTEST: SHOW US YOUR BARE PARTS!

We are holding a contest for our valued customers; the prize is a free barrel of Wheelstrip 273WL on your next order (freight not included).

The photo that stands out the most will be the winner. Be original and demonstrate the effectiveness of our product on your parts!

All you must do to enter the contest is follow the rules below!


Rules:

  • Take a picture of a stripped metal part with the Greensolv logo
  • Post the picture on your Instagram or Facebook page and identify us
  • Use the #showusyourbareparts tag
  • Send proof of publication to the following address:  schampagne@greensolv.com

You have until November 28th at 1pm to send us your picture!

We will choose the winner on December 2nd  and the winner will be announced on our Website, Instagram and Facebook.

Good luck!

#SHOWUSYOURBAREPARTS

Instagram